TWO-101 · Operator station 1Technical White Oil Unit

Sim time00:00:00
Batch—
SequenceIDLE
Active alarms0
Speed

Process overview Click any equipment for its faceplate

N₂ blanket Process water to SC-101 SC-101 SO₂ 0.0 ppm pH 12.5 K-101 TK-101 0 % 0 t P-101 102A 0% 102B 0% P-102 R-101A IDLE 32.0 °C 0 % S 5000 ppm ASTM 2.5 M CH-101 XV-131 TK-103 0 % P-103 TK-104 0% P-104 XV-161 R-102 35.0 °C 0 % pH — M TV-121 XV-171 TK-106 0 % P-105 D-101 35.0 °C 1013 mbar H₂O — 0 % VP-101 TV-201 P-106 RF-101 R-103 35.0 °C 0 % Say — M TV-301 P-107 F-101 0.0 bar Spent clay 0 kg TK-105 0 % 0 t Say +28
Running / open Stopped / closed Stopped by operator Tripped Flow Acid sludge Water phase

Alarm summary

Trend · R-101A ━ TI-111 °C  ━ LI-111 %

Batch sequence

    Training simulation based on drawing TWO-PFD-001 Rev A. Values are modeled, not measured. Try stopping CH-101 during an oleum dose or K-101 with acid in R-101A to see the interlocks act.